Skip to content
Sky Height Safety
Services
Inspection & Certification
Guardrail TestingSafety Line TestingEyebolt TestingAbseil Anchor TestingMobile Man AnchorDavit Systems TestingLightning ProtectionPPE ComplianceFixed Ladder Inspection
Installation
Guardrail InstallationSafety Line InstallationEyebolt InstallationMobile Man Anchor InstallDavit Arm InstallationLightning Protection InstallAbseiling AnchorsSkylight Fall ProtectionFixed Access LaddersLadder Fall ArrestRoof Walkways
Projects Locations About News London 0204 572 5223 Request a Quote
Last updated · September 2026 · Reporting year FY 2025/26

Carbon Reduction Plan

Hoists and Cranes UK Ltd, trading as Sky Height Safety, is committed to reaching net zero greenhouse gas emissions across Scope 1, 2 and 3 by 2045. This plan sets out our baseline, where our emissions come from, the targets we have set and the programme that will deliver them. It follows the template and reporting standard in Cabinet Office Procurement Policy Note 006 (formerly PPN 06/21) and is structured for the NHS Net Zero Supplier Roadmap.

Supplier
Hoists and Cranes UK Ltd
Company no. 11188629
Net zero
2045
Scope 1, 2 and 3
FY 2030/31 target
−42%
Scope 1 and 2
Baseline year
FY 2025/26
Year ending 28 February

Emissions figures pending. Our first footprint, for FY 2025/26 (1 March 2025 to 28 February 2026), is being finalised. Figures marked pending will be published here once they have been calculated and approved by a director.

Contents
  1. Commitment to achieving net zero
  2. About us and the scope of this plan
  3. Where our emissions come from
  4. Baseline emissions footprint
  5. Current emissions reporting
  6. Methodology and data quality
  7. Scope 3 screening
  8. Emissions reduction targets
  9. Completed carbon reduction initiatives
  10. Our reduction programme
  11. Offsetting and residual emissions
  12. Governance, monitoring and reporting
  13. Declaration and sign off

1. Commitment to achieving net zero

Hoists and Cranes UK Ltd is committed to achieving net zero emissions by 2045.

That is five years ahead of the 2050 date required by PPN 006 and set by the Climate Change Act 2008. We chose 2045 because many of the estates we work on are in the public sector, and the NHS has committed to net zero across its supply chain by 2045. We intend to be ready for that, not to catch up with it.

For us, net zero means cutting absolute emissions across Scope 1, 2 and 3 by at least 90% against our FY 2025/26 baseline, and neutralising whatever remains (no more than 10% of the baseline) with permanent carbon removals. Offsets are not counted towards any reduction target in this plan.

2. About us and the scope of this plan

Hoists and Cranes UK Ltd is a private limited company registered in England and Wales (company number 11188629). Our registered office is Windover House, St Ann Street, Salisbury SP1 2DR. We operate from our head office at Unit 11, Melbury Business Park, Shaftesbury, Dorset SP7 0AF, and from our London office at 66 Paul Street, London EC2A 4NA. The company has two divisions:

  • Lifting equipment. Supply, installation, servicing, repair and thorough examination of hoists, cranes and lifting equipment under LOLER and PUWER.
  • Sky Height Safety. Inspection, testing, certification and installation of fall protection and roof access systems, including anchors, safety lines, guardrail, ladders, walkways, davits and lightning protection.

Both are field-service businesses. The work itself happens on other people’s roofs, plant rooms and production floors, and most of the energy we use goes on getting engineers, test equipment and materials there and back.

Boundary. This plan covers the whole company, both divisions, every site and every vehicle. We use the operational control approach: we report every emission from activities we control, wherever they take place. Most of our work is in the UK. Travel for work abroad is included under business travel.

Period. Our financial year runs from 1 March to 28 February. Years are shown in this plan as, for example, FY 2025/26 for 1 March 2025 to 28 February 2026.

3. Where our emissions come from

For a business like ours, fuel for the vehicle fleet is usually the largest single source of emissions. Our reduction programme is weighted accordingly, and the finalised footprint confirms the split. The list below shows each activity, the scope it falls under and where the data comes from.

Scope 1
Driving company vans and cars to site
Data: Fuel card litres per vehicle, mileage records
Scope 1
Heating and fuel-burning plant at our premises
Data: Meter readings and fuel invoices
Scope 1
Refrigerant leaks from air-conditioning units
Data: F-gas service and top-up records
Scope 2
Electricity at our sites, including vehicle charging
Data: Utility bills, charge point records, home charging claims
Scope 3
Supplier deliveries of systems, components and lifting equipment, and couriers we pay for
Data: Delivery records by weight and distance, or spend where these are not available
Scope 3
Waste from our offices, and components, packaging and metal removed from site
Data: Waste transfer notes (weight and treatment route)
Scope 3
Hotels, rail, flights, ferries, hire cars and private cars used for work
Data: Booking records, expense and mileage claims
Scope 3
Staff travel to our Shaftesbury and London offices, and homeworking
Data: Annual staff travel survey
Scope 3
Delivery of equipment we sell, where the customer arranges and pays for it
Data: Delivery records, or spend where these are not available

Each mile is counted once. Engineers who drive company vans straight from home to site are counted in Scope 1, not in commuting. Private cars used for work are counted in business travel.

4. Baseline emissions footprint

Baseline emissions are a record of the greenhouse gases that were produced in the past, before the introduction of any strategies to reduce emissions. They are the reference point against which emissions reduction is measured.

Baseline year: FY 2025/26 (1 March 2025 to 28 February 2026).

Additional details relating to the baseline emissions calculations. FY 2025/26 is the first financial year for which we have compiled a complete footprint, and it reflects the company as it is now: both divisions, both offices and the whole fleet. It includes the effect of the measures that were already in place (section 9), so every reduction we report is measured from the business as it actually operated. If the business changes significantly, for example through an acquisition, a new site or a methodology change that moves the baseline total by 5% or more, we will recalculate the baseline and explain why.

Baseline year emissions, FY 2025/26
EmissionsTotal tCO2eShare
Scope 1 Pending
Company vehiclesFuel used in owned and leased vans and cars Pending
Premises and plantGas, heating oil, LPG and generator fuel at our sites Pending
Refrigerant lossesLeakage from air-conditioning equipment Pending
Scope 2 Pending
Purchased electricityOur sites and vehicle charging, location-based Pending
Scope 3 (included sources) Pending
Upstream transportation and distributionCategory 4. Supplier deliveries and couriers we pay for Pending
Waste generated in operationsCategory 5. Office waste and material removed from site Pending
Business travelCategory 6. Hotels, rail, flights, ferries, hire cars and private cars used for work Pending
Employee commutingCategory 7. Travel to our offices and homeworking Pending
Downstream transportation and distributionCategory 9. Delivery of equipment we sell, where we do not pay for it Pending
Total emissions Pending

5. Current emissions reporting

Reporting year: FY 2025/26 (1 March 2025 to 28 February 2026).

This is our first Carbon Reduction Plan, so the reporting year and the baseline year are the same, and the figures are those in section 4. From FY 2026/27 onwards this section reports the latest year alongside the change against the baseline, and the chart in section 8 plots it against our targets.

6. Methodology and data quality

  • Standards. Emissions are calculated and reported under the GHG Protocol Corporate Accounting and Reporting Standard, the GHG Protocol Corporate Value Chain (Scope 3) Standard and the PPN 006 reporting standard for Carbon Reduction Plans. Scope 1 and 2 follow the government’s Environmental Reporting Guidelines, which include the Streamlined Energy and Carbon Reporting (SECR) requirements.
  • Conversion factors. We use the UK Government greenhouse gas conversion factors for company reporting, published by the Department for Energy Security and Net Zero, for the calendar year in which most of the financial year falls.
  • Gases. All seven Kyoto Protocol greenhouse gases, expressed as tonnes of carbon dioxide equivalent (tCO2e).
  • Consolidation. Operational control. Leased vehicles and premises that we operate are included in Scope 1 and 2.
  • Scope 2. Reported on the location-based method (the average UK grid factor). Once we buy renewable electricity we will also report the market-based figure, but progress against our targets is always measured on the location-based figure.
  • Data sources. Fuel cards and fuel invoices give actual litres for most vehicles. Where only mileage is available, we apply the government factor for that vehicle type. Electricity and gas come from bills and meter readings, apportioned by floor area where we share a building. Waste comes from waste transfer notes, travel from booking records and expense claims, and commuting from an annual staff survey.
  • Estimates. Where activity data is not available, for example for some supplier deliveries, we use spend-based estimates and say so. Estimates are replaced with measured data as our systems improve.
  • Completeness. Every PPN 006 category is reported. A category that does not apply in a given year is reported as zero with a note, not left out.
  • Review. Figures are prepared internally, checked against source records and approved by a director before publication.

7. Scope 3 screening

PPN 006 requires five Scope 3 categories, and we report all five. From April 2027 the NHS will expect suppliers to report every relevant Scope 3 category, so we have screened all 15 categories in the GHG Protocol Scope 3 Standard against how our business actually works. Categories marked for measurement will be included from FY 2026/27, using spend-based estimates where activity data is not yet available.

Cat. 1
Purchased goods and services
Fall protection systems and components, lifting equipment and spares, steel and aluminium sections, PPE, calibration, software and subcontracted services. Likely to be our largest Scope 3 source.
From FY 2026/27
Cat. 2
Capital goods
Vehicles, load-testing and inspection equipment, and IT hardware.
From FY 2026/27
Cat. 3
Fuel- and energy-related activities
The emissions from producing and delivering the fuel and electricity we use, including grid losses. Calculated directly from our Scope 1 and 2 data.
From FY 2026/27
Cat. 4
Upstream transportation and distribution
Supplier deliveries and couriers that we pay for.
Reported now
Cat. 5
Waste generated in operations
Office waste, packaging, and components and metal removed from site during remedial and replacement work.
Reported now
Cat. 6
Business travel
Hotels for engineers working away, rail, flights and ferries (including Northern Ireland and overseas lifting work), hire cars and private cars used for work.
Reported now
Cat. 7
Employee commuting
Staff travel to our offices and homeworking. Engineers who drive company vans from home are counted in Scope 1, not here.
Reported now
Cat. 8
Upstream leased assets
Not relevant. Leased vehicles and premises are under our operational control, so they are reported in Scope 1 and 2.
Not relevant
Cat. 9
Downstream transportation and distribution
Most equipment we supply is delivered and installed by our own engineers, which is counted in Scope 1. Third-party deliveries the customer pays for are reported here.
Reported now
Cat. 10
Processing of sold products
Not relevant. We supply finished products and install them ourselves.
Not relevant
Cat. 11
Use of sold products
Relevant to the lifting division only: electric hoists and cranes use electricity throughout their working life. Fall protection systems are passive and use no energy.
From FY 2026/27
Cat. 12
End-of-life treatment of sold products
Steel, stainless steel and aluminium systems at the end of their life. Small, and largely recyclable.
From FY 2026/27
Cat. 13
Downstream leased assets
Applies only to equipment we hire out to customers. Included from FY 2026/27 where it applies.
From FY 2026/27
Cat. 14
Franchises
Not relevant. We do not operate franchises.
Not relevant
Cat. 15
Investments
Not relevant. We are not an investor or financial institution.
Not relevant

8. Emissions reduction targets

To continue our progress to net zero, we have adopted the following carbon reduction targets. All are absolute reductions against the FY 2025/26 baseline.

−42%
Scope 1 and 2
By FY 2030/31
Tonnage published with the baseline

Absolute reduction against the baseline.

−75%
Scope 1 and 2
By FY 2035/36
Tonnage published with the baseline

In step with a fully zero-emission fleet.

−25%
Scope 3, reported categories
By FY 2030/31
Tonnage published with the baseline

The five PPN 006 categories.

Net zero
Scope 1, 2 and 3
By FY 2044/45
Tonnage published with the baseline

At least 90% reduction, residual neutralised by permanent removals.

We project that our emissions will fall over the next five years by 42% across Scope 1 and 2 and by 25% across the reported Scope 3 categories by FY 2030/31. The combined tonnage and percentage will be published here with the finalised baseline.

The FY 2030/31 Scope 1 and 2 target is a 42% cut in five years. That is twice the 4.2% a year linear rate commonly used as the minimum for a 1.5°C-aligned target. The fleet makes it achievable: vans are replaced on a regular cycle, and from FY 2028/29 every replacement is zero-emission wherever a suitable vehicle exists (section 10).

Supporting milestones:

  • By April 2027, every relevant Scope 3 category measured, ready for the NHS April 2027 requirements.
  • By FY 2027/28, a renewable electricity tariff at every site where we hold the supply contract.
  • From FY 2028/29, every replacement vehicle zero-emission wherever a suitable vehicle exists for its duty cycle.
  • By FY 2035/36, a fully zero-emission fleet.

Progress against these targets can be seen in the graph below.

Target pathway, as a percentage of FY 2025/26 emissions
Scope 1 and 2 Scope 3, reported categories
100%75%50%25%0%
Net zero residual, max 10% BaselineFY 2025/26 · 100% Scope 1 and 2FY 2030/31 target
58% of baseline
Scope 1 and 2FY 2035/36 target
25% of baseline
Scope 3, reported categoriesFY 2030/31 target
75% of baseline
Net zeroFY 2044/45 target
At least 90% below baseline across all scopes
Scope 3Scope 1 and 2−25%−42%−75%
2025/262030/312035/362040/412044/45
Straight lines join the committed milestones in the targets above. The shaded band is the residual (at most 10% of baseline) to be neutralised by permanent removals at net zero. Reported years are plotted against the pathway as each footprint is completed.

9. Completed carbon reduction initiatives

The following environmental management measures were already in place during the FY 2025/26 baseline year. Their effect is included in the baseline footprint, so no separate saving is claimed for them. They will be in effect when performing the contract.

ISO 14001:2015 environmental management system

Our environmental management system is independently certified and audited. It covers waste handling, transport and on-site procedures, and sets environmental objectives that are reviewed at management review. The targets in this plan are carried into it as environmental objectives.

Digital certificates and reports through CertFlow

Inspection results, photographs, signatures and asset registers are captured on site on mobile devices and issued to clients as digital certificates and reports, rather than printed report packs.

Scheduled recertification

CertFlow tracks every 12-month and 6-month recertification date, so visits are planned in advance rather than arranged at short notice. Advance scheduling is what makes the route clustering in section 10 possible.

Regional dispatch from two bases

Work is split by region between our London and Shaftesbury bases, so engineers start from the base that serves the region they are working in.

10. Our reduction programme

In the future we will implement the further measures below. Each is carried into our ISO 14001 environmental objectives with an owner and a target date, and each year’s update of this plan reports what has been delivered and moves completed measures into section 9.

Fleet and journeys Scope 1 and Scope 3 business travel

The fleet is where most of our reduction will come from, so it is where most of the programme sits.

  1. Measure every vehicle FY 2026/27

    Telematics on every fleet vehicle and a monthly fuel and mileage report per vehicle, covering fuel economy, idling time and journey efficiency. What gets measured by vehicle gets managed by vehicle.

  2. Cluster recertifications by area FY 2026/27

    Use the CertFlow recertification schedule to group annual inspections by postcode area into single trips, and offer clients aligned renewal dates for sites that are close together.

  3. Get it right on the first visit FY 2026/27

    A desk check before every visit of previous certificates, the asset register, access arrangements and permits, so visits are not aborted or repeated. Engineers carry common replacement components so minor remedial work is completed on the same visit.

  4. Fuel-efficient driving FY 2026/27

    Fuel-efficient driving training for everyone who drives a fleet vehicle, a no-idling rule, a maximum cruising speed policy, and tyre pressures added to weekly vehicle checks.

  5. Stay over rather than drive back FY 2026/27

    For multi-day jobs a long way from base, engineers stay locally rather than making daily return journeys, where that reduces total mileage. It also reduces driver fatigue.

  6. Zero-emission replacements From FY 2028/29

    Every vehicle replaced from FY 2028/29 onwards is zero-emission wherever one is available that meets the payload, towing and range the role needs, starting with London-based vehicles on shorter urban journeys. Where none is suitable yet, the replacement is the lowest-emission option available, and we will trial HVO renewable diesel in the diesel vehicles that remain.

  7. Charging infrastructure FY 2028/29

    Workplace charging at the Shaftesbury head office, and metered home charging for engineers who keep vans at home, reimbursed at cost so every kilowatt-hour is recorded.

  8. A fully zero-emission fleet FY 2035/36

    Commercial vans are typically replaced on a three to five-year cycle, so every vehicle in the fleet will come up for replacement at least once before this date.

Premises and energy Scope 1 and Scope 2

Our premises are a smaller share of the footprint, but the measures are quick and cheap.

  1. Renewable electricity FY 2027/28

    A renewable electricity tariff backed by Renewable Energy Guarantees of Origin (REGOs) at every site where we hold the supply contract, and energy data requested from the landlord for any space we do not meter ourselves. Targets stay measured on the location-based figure, so the tariff switch is not counted as a reduction.

  2. Energy efficiency FY 2027/28

    LED lighting, heating controls and timers, and an end-of-day switch-off check at each site.

  3. Low-carbon heating At end of life

    Any fossil-fuel heating is replaced with a heat pump or electric system when it reaches the end of its life.

Materials, waste and suppliers Scope 3

Most of our Scope 3 footprint sits in what we buy. We influence it through what we specify and who we buy from.

  1. Recycle metal removed from site FY 2026/27

    Steel, stainless steel and aluminium from decommissioned guardrail, anchors and cable systems, and copper and aluminium conductors from lightning protection work, segregated and sent for recycling, with tonnage recorded on waste transfer notes.

  2. Repair before replace FY 2026/27

    Where a system can be brought back into compliance by replacing components rather than the whole system, that is what we recommend, provided the repair meets BS EN 795, BS 7883 and the manufacturer’s requirements. Safety is never traded for carbon.

  3. Fewer, fuller deliveries FY 2026/27

    Material orders for each project consolidated into a single consignment delivered straight to site where possible, and suppliers asked to take back pallets and packaging.

  4. Supplier engagement FY 2027/28

    Our largest suppliers by spend asked for their own carbon reduction plans and product Environmental Product Declarations (EPDs). Environmental questions added to supplier approval. Where products are technically equivalent, we specify those with EPDs and higher recycled content.

People and business travel Scope 3

Travel that does not involve carrying equipment has low-carbon alternatives, and we will use them.

  1. Rail and video calls first FY 2026/27

    Rail is the default for travel without equipment, such as training courses and meetings. Video calls are the default for meetings that do not need a site visit.

  2. Commuting FY 2026/27

    A cycle-to-work scheme, car sharing between colleagues, and hybrid working for office roles where the role allows. An annual staff travel survey to measure the result.

  3. Training and awareness FY 2026/27

    Environmental awareness in every induction and in regular toolbox talks, covering fuel-efficient driving, waste segregation and this plan.

11. Offsetting and residual emissions

  • Reduction comes first. Carbon credits are not used to meet any target in this plan and are never netted off our reported emissions.
  • At net zero, no more than 10% of our baseline emissions will be addressed through carbon removals. That residual will be neutralised with permanent removals, verified under a recognised standard.
  • If we buy carbon credits before 2045, we will report them separately from our emissions, with the standard, project type and volume.

12. Governance, monitoring and reporting

  • Accountability. The director who signs this plan is accountable for delivering it. Progress against it is reviewed at our ISO 14001 management review.
  • Monitoring. From FY 2026/27, fuel and mileage are reviewed monthly by vehicle and energy use quarterly by site. The full footprint is calculated annually.
  • Reporting. We calculate our footprint for each financial year and republish this plan within six months of the year end (by 31 August), approved by a director. Where a contract requires it, we provide the annual update to the customer directly.
  • Enquiries. Questions about this plan can be sent to info@skyheightsafety.com.

13. Declaration and sign off

This Carbon Reduction Plan has been completed in accordance with PPN 006 and associated guidance and reporting standard for Carbon Reduction Plans.

Emissions have been reported and recorded in accordance with the published reporting standard for Carbon Reduction Plans and the GHG Reporting Protocol corporate standard, and use the appropriate Government emission conversion factors for greenhouse gas company reporting.

Scope 1 and Scope 2 emissions have been reported in accordance with SECR requirements, and the required subset of Scope 3 emissions has been reported in accordance with the published reporting standard for Carbon Reduction Plans and the Corporate Value Chain (Scope 3) Standard.

This Carbon Reduction Plan has been reviewed and signed off by the board of directors.

Signed on behalf of the supplier
Name
Awaiting director sign-off
Position
Director, Hoists and Cranes UK Ltd
Date
Pending
Sky Height Safety

UK-wide fall protection testing, inspection, certification and installation. A division of Hoists and Cranes UK Limited.

ISO 9001:2015
ISO 14001:2015
ISO 45001:2018
SafeContractor Approved
Inspection
Guardrail TestingSafety Line TestingEyebolt TestingAbseil Anchor TestingMobile Man AnchorDavit SystemsLightning ProtectionPPE ComplianceFixed Ladder Inspection
Installation
Guardrail InstallationSafety Line InstallationEyebolt InstallationMobile Man AnchorDavit Arm InstallationLightning ProtectionAbseiling AnchorsSkylight ProtectionFixed Access LaddersLadder Fall ArrestRoof Walkways
Company
About UsMeet The TeamProjectsNewsBlogContactFree Compliance CheckCertFlow
County Coverage
EssexKentSurreyHertfordshireEast SussexLondon Boroughs
Offices
LONDON
66 Paul Street
London EC2A 4NA
0204 572 5223
HEAD OFFICE
Unit 11, Melbury Business Park
Shaftesbury, Dorset SP7 0AF
07450 053021
© 2026 Sky Height Safety. A division of Hoists and Cranes UK Limited. All rights reserved.
Terms & Conditions Privacy Policy Carbon Reduction Plan Modern Slavery Statement LinkedIn

We use Google Analytics to understand how visitors use this site. These are optional analytics cookies — declining means we collect nothing. Read the privacy policy.